Always private
DuckDuckGo never tracks your searches.
Learn More
You can hide this reminder in Search Settings
All regions
Argentina
Australia
Austria
Belgium (fr)
Belgium (nl)
Brazil
Bulgaria
Canada (en)
Canada (fr)
Catalonia
Chile
China
Colombia
Croatia
Czech Republic
Denmark
Estonia
Finland
France
Germany
Greece
Hong Kong
Hungary
Iceland
India (en)
Indonesia (en)
Ireland
Israel (en)
Italy
Japan
Korea
Latvia
Lithuania
Malaysia (en)
Mexico
Netherlands
New Zealand
Norway
Pakistan (en)
Peru
Philippines (en)
Poland
Portugal
Romania
Russia
Saudi Arabia
Singapore
Slovakia
Slovenia
South Africa
Spain (ca)
Spain (es)
Sweden
Switzerland (de)
Switzerland (fr)
Taiwan
Thailand (en)
Turkey
Ukraine
United Kingdom
US (English)
US (Spanish)
Vietnam (en)
Safe search: moderate
Strict
Moderate
Off
Any time
Any time
Past day
Past week
Past month
Past year
  1. hpc-escape2.eu

    D6.3 Exploitation Plan after closure revisits the planned exploitation activities already defined in D6.2 and identifies both Intellectual Property developed during the project as well as further exploitation activities. As already mentioned in D6.2, ESCAPE-2 does not lend itself to a consortium-wide exploitation as the output of the project is ...
  2. Was this helpful?
  3. hpc-escape2.eu

    ESCAPE-2 2021 D6.3 Exploitation Plan after closure 2 2.2.2 Work performed in this deliverable To produce this deliverable, a final exploitation questionnaire was created and circulated for completion by all consortium partners. Responses were collated and analysed and the findings reported. 2.2.3 Deviations and counter measures
  4. cordis.europa.eu

    Towards the end of the project, HPCWE will deliver a step change in the application of HPC on wind flow simulations and will reshape almost every stage of wind energy exploitation. The success of HPCWE will also bridge the current discipline boundaries between the underlying scientific areas (fundamental fluid physics, wind energy, high-order ...
  5. cordis.europa.eu

    Dec 11, 2023At almost every stage in wind energy exploitation ranging from wind turbine design, wind resource assessment to wind farm layout and operations, the application of HPC is a must. The goal of HPCWE is to address the key open challenges in applying HPC on wind energy, including efficient use of HPC resources in wind turbine simulations, accurate ...
  6. epcc.ed.ac.uk

    EPCC is a partner in a new £2m Horizon 2020 project that will apply the benefits of high performance computing to wind energy exploitation. Read the full announcement below. The University of Nottingham is leading a £2m high performance computing (HPC) project to optimise the sustainable exploitation of wind power in both the European and ...
  7. interlink-project.eu

    The present Communication, Dissemination and Exploitation Plan (CoDEP) is part of Work Package n. 7, specifically the detailed objective 07.01 Prepare, plan and perform Interactive dissemination strategies, codified as deliverable D7.2 Dissemination and communication plan. The present CoDEP has two key objectives: 1.
  8. cordis.europa.eu

    Thematic Priority: ICT-2009.1.2 - Internet of Services, Software and Virtualisation D9.9.1 - Exploitation Plan WP 9: Dissemination & Exploitation Due Date: M12 Submission Date: 30/09/2011 Start Date of Project: 01/10/2010 Duration of Project: 30 months Organisation Responsible for the Deliverable: Atos Origin Version: 1.0 Status Final
  9. treasureproject.eu

    Deliverable 8.2 focuses on finalizing the exploitation plan structure using, as a baseline, the initial exploitation plan presented in D8.1. To this aim, tangible and intangible results will be ... As a matter of fact, the dissemination paves the way to exploitation activity being part of the same process aiming at letting other know about ...
  10. Exploitation Plan and is to be implemented in three distinct phases with respect to different types of outcomes - Project awareness phase, Components dissemination phase, and ... are a substantial part of electrolysis systems' cost. Within the PEACE project, a demonstrator of an AEL system exceeding à kW, capable of

    Can’t find what you’re looking for?

    Help us improve DuckDuckGo searches with your feedback

Custom date rangeX