Always private
DuckDuckGo never tracks your searches.
Learn More
You can hide this reminder in Search Settings
All regions
Argentina
Australia
Austria
Belgium (fr)
Belgium (nl)
Brazil
Bulgaria
Canada (en)
Canada (fr)
Catalonia
Chile
China
Colombia
Croatia
Czech Republic
Denmark
Estonia
Finland
France
Germany
Greece
Hong Kong
Hungary
Iceland
India (en)
Indonesia (en)
Ireland
Israel (en)
Italy
Japan
Korea
Latvia
Lithuania
Malaysia (en)
Mexico
Netherlands
New Zealand
Norway
Pakistan (en)
Peru
Philippines (en)
Poland
Portugal
Romania
Russia
Saudi Arabia
Singapore
Slovakia
Slovenia
South Africa
Spain (ca)
Spain (es)
Sweden
Switzerland (de)
Switzerland (fr)
Taiwan
Thailand (en)
Turkey
Ukraine
United Kingdom
US (English)
US (Spanish)
Vietnam (en)
Safe search: moderate
Strict
Moderate
Off
Any time
Any time
Past day
Past week
Past month
Past year
  1. made4wind.eu

    The MADE4WIND project is driven by a singular goal: to develop and test innovative components for a 15 MW FWT. Through pioneering designs and manufacturing techniques, the project aims to introduce breakthroughs in lightweight materials, recyclability, and advanced software tools, paving the way for a sustainable future in offshore wind energy.
  2. Was this helpful?
  3. made4wind.eu

    MADE4WIND will develop and test innovative components concepts for a 15 MW FWT consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain. ... ACCIONA's CT-bos20 solution will be taken as a base case for MADE4WIND. The CT-bos is a TLP platform with a geometry based on a concrete port caisson which provides ...
  4. optimise (critical) raw material use. www.made4wind.eu MADE4WIND will develop and test innovative components concepts for a 15 MW FWT consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain. These innovations will jointly allow future FWT to include new circular lightweighted materials, minimize the
  5. inf4inity.com

    MADE4WIND aims to develop and test innovative components' concepts for a 15MW offshore Floating Wind Turbine (FWT) consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain. MADE4WIND plans to develop and validate several innovations to design, manufacture and operate FWT components, capable of improving ...
  6. made4wind.eu

    MADE4WIND plans to develop and validate several innovations to design, manufacture and operate FWT components, capable of improving the viability, lifetime and sustainability of offshore wind energy the viability, lifetime and sustainability of offshore wind energy installed in deep waters, thus facilitating the mass deployment of offshore wind energy while minimising the environmental impact.
  7. On the other hand, many offshore wind farms (WF) will reach their end of life in the coming years, calling attention to the importance "circularity by design" to optimise (critical) raw material use. SOLUTION. MADE4WIND will develop and test innovative components concepts for a 15 MW FWT consisting of new designs and manufacturing ...
  8. Dec 1, 2023With this in mind, the EU-funded MADE4WIND project aims to develop and test innovative components for a 15 MW FWT. Specifically, the project will introduce new designs and manufacturing techniques. These include breakthroughs in lightweight materials, recyclability, and advanced software tools that promise a sustainable future for offshore wind ...
  9. MADE4WIND: Innovative circular materials and design methods for the development of Floating Wind Turbine components for offshore Wind Farms of the future Background: MADE4WIND aims to develop and test innovative components' concepts for a 15 MW FWT consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain.
  10. cordis.europa.eu

    MADE4WIND aims to develop and test innovative components' concepts for a 15MW offshore Floating Wind Turbine (FWT) consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain.The main results obtained in the project will be:- Novel FWT...
  11. rope (2019)), and GE will launch its 12 MW Haliade-X offshore turbine to the market in 2021. Thus for continued development of e.g. foundation design, wind farm control and logistic studies, a reference wind turbine above 10 MW is needed. This is the motiva-tion for the IEA 15 MW reference wind turbine. The turbine is in the present report

    Can’t find what you’re looking for?

    Help us improve DuckDuckGo searches with your feedback

Custom date rangeX