Always private
DuckDuckGo never tracks your searches.
Learn More
You can hide this reminder in Search Settings
All regions
Argentina
Australia
Austria
Belgium (fr)
Belgium (nl)
Brazil
Bulgaria
Canada (en)
Canada (fr)
Catalonia
Chile
China
Colombia
Croatia
Czech Republic
Denmark
Estonia
Finland
France
Germany
Greece
Hong Kong
Hungary
Iceland
India (en)
Indonesia (en)
Ireland
Israel (en)
Italy
Japan
Korea
Latvia
Lithuania
Malaysia (en)
Mexico
Netherlands
New Zealand
Norway
Pakistan (en)
Peru
Philippines (en)
Poland
Portugal
Romania
Russia
Saudi Arabia
Singapore
Slovakia
Slovenia
South Africa
Spain (ca)
Spain (es)
Sweden
Switzerland (de)
Switzerland (fr)
Taiwan
Thailand (en)
Turkey
Ukraine
United Kingdom
US (English)
US (Spanish)
Vietnam (en)
Safe search: moderate
Strict
Moderate
Off
Any time
Any time
Past day
Past week
Past month
Past year
  1. cordis.europa.eu

    Deliverables Documents, reports (10) Report on the service which will enable the formal specification of the evaluation questions and instruments conducting the data collection and the automatic analysis and reports Report on Use Cases and User Requirements Formalisation Report on the specification of use cases following workshop interactions Periodic Report 2 on Communication and ...
  2. cordis.europa.eu

    To advance and measure endorsement by verification practitioners and content creators, the project's evaluation surveys have developed specific measures regarding perceptions of usefulness, intention to use, and open-questions on features that would increase usefulness and intention to use.
  3. cordis.europa.eu

    Report on the framework that will serve as a theoretical basis and model for conducting formative and summative evaluation and validation of the projects research and technical outcomes Report for ICT28 Coordination and Support Actiona Report on all interaction and cooperation with the CSA Periodic Report 2 including Project Evaluation
  4. era-learn.eu

    When the final reporting period ends a session for preparing and submitting the final periodic report will open in the EC Portal. The following documents are required: technical part: upload Technical Report Part B, fill in online forms e.g. "Summary for Publication", "Publications", "Gender" etc. financial statements: online form which needs to be filled in by each beneficiary to ...
  5. safetycube-project.eu

    This report, D1.2 Project Report - months 1 - 18, provides an overview of the work undertaken in the SafetyCube project. At the time of the preparation of the project the reporting requirements were not known and an internal mid-term evaluation of the project was considered to be helpful to the project team.
  6. ec.europa.eu

    at the end of the project a final report and a questionnaire must also be submitted (in addition to the periodic report for the final reporting period); if a reporting period is 25 months or more a mid-term progress report must be submitted at the middle of the period.
  7. caddy-fp7.eu

    I, as scientific representative of the coordinator of this project and in line with the obligations as stated in Article II.2.3 of the Grant Agreement declare that: The attached periodic report represents an accurate description of the work carried out in this project for this reporting period; The project (tick as appropriate) 1:
  8. gridprovenance.org

    In this final report, we summarise the scientific achievements of the European project Provenance, its progress with respect to its stated objectives, and the effort that project partners have put in place to exploit results.
  9. usaceengineeringpamplets2.tpub.com

    operational adequacy of the project. Operational adequacy.Inspectionsandevaluations are performed by adequacymeansthe inspecting, testing, operating,and teams of experienced design, construction, and evaluation of those components of the projectwhose 4-2 Previous Page Index Next Page

    Can’t find what you’re looking for?

    Help us improve DuckDuckGo searches with your feedback

Custom date rangeX